PKPolitics Discuss » Current Issues

The wasted solar solution

(6 posts)
  1. The most embittering aspect of the mass misery over electricity is that the crippling shortages never had to happen. Pakistan could have adopted solar energy years ago if government priorities had focused less on protectionist privatization and more on people.

    The number of solar-electrified homes in Bangladesh recently numbered a million. This year, half a million more solar systems will be installed. The cost in Bangladesh for a small home to run four energy-saver lights, a TV and a fan is $300 (Rs25,500), repayable in instalments. Solar power systems have been installed in Bangladesh’s prime minister’s office and even its central bank. Why can’t Pakistan take similar steps?

    Pakistan’s per capita energy consumption is below half the average for developing countries, 1/8 of the world average, 1/25 of developed nations and 1/60 of the average American. In Karachi alone, there is a shortfall of 600 megawatts against a demand of 1,787 megawatts.

    Japan, the world’s third largest economy, generates 30 per cent of its power from nuclear plants. But after an earthquake and tsunami crippled the Fukishima nuclear plant, they have scrapped future nuclear reactors to plan for 10 million solar-powered homes instead. While militarily beating a bloody path to the fossil fuel fields of the world, the US is nevertheless planning a giant solar plant in the Arizona desert to serve the country. It recently awarded two billion dollars to two solar companies. Saudi Arabia is going further, recognising that even its vast oil reserves are finite, and gearing to produce and export a full quarter of the world’s solar electricity needs.

    Solar system companies entered our markets a decade ago, yet progress remains sluggish.

    The earth receives more free energy from the sun in one hour than what the whole world uses in a year. So it’s clearly absurd to throw money after finite fossil fuels. KESC produces 55 per cent of Karachi’s electricity and its market is spread over 6,000 square kilometers. Not only are the distribution lines old and falling apart, it is unable to meet demand or contend with theft of 40 per cent of the electricity by the kunda mafia.

    A basic uninterruptible power supply (UPS) unit averages Rs20,000 and a small generator costs Rs37,500, with monthly running costs of Rs1,000 and Rs6,000 respectively. A solar fan and two energy-saver lights supported by a solar panel cost Rs26,000 — the minimum need for a shop operating on direct current. Nothing could be cheaper or cleaner. Unfortunately, most people cannot afford the start-up costs.
    Narrowly viewing solar panels as a revenue source, the government overtaxes them at 30 per cent, thereby foolishly stifling commerce, which could ultimately fetch far more revenue. There are rumors that recent riots have inspired dropping this tax, but these are yet to be confirmed. A survey showed that, encouragingly, 90 per cent of shopkeepers favored solar power. What stalled them were fears of KESC retaliating for ‘taking away its market’ (even though it simply cannot serve all of it) and disconnecting them from the grid.

    To derive maximum energy, solar panel brackets need be connected to tracking devices to move with the angle of the sun. This requires more space, and of course, cost. But then, it yields 40 per cent more energy. For the moment, solar systems could supplement KESC supply until independent stand-alone systems, which could avoid conflict with KESC, are affordable. But the state could catalyze the process by introducing solar power into its offices and for streetlights.

    Those who lose the most from lack of electricity are the masses — workers dependent on running factories and offices, home-based, piece-wage women workers and other poor people who constitute the overwhelming majority. Their minimum need is a solar lamp with a panel, which costs Rs5,000. Industries, companies and contractors could assist their workers with acquiring these.

    If long-term loans can be extended for houses and cars, why can’t they also be extended for much smaller loans for solar systems? The government considers solar power prohibitively expensive, yet thinks nothing of pursuing multi-billion dollar dams and other white elephants.
    http://tribune.com.pk/story/194835/the-wasted-solar-solution/

    Posted 11 months ago on 24 Jun 2011 11:55 #
  2. scandinavian
    Member

    @S.E.Mirza sb.

    There are so many good ideas i.e. low hanging fruits to taken advantage of, but we cannot implement these good ideas as long as we tolerate INCOMPETENT and CORRUPT the core politicians/army generals as our leaders.

    Posted 11 months ago on 24 Jun 2011 12:15 #
  3. Correct brother. The all powerful mafias active, like fossil fuel mafia and the kunda mafia, won't allow a common man able to help himself in case he affords/errects such a system for his home.
    As soon as you have errected one you might be visited by these crooks demanding a valid permit to your deed.

    Posted 11 months ago on 24 Jun 2011 12:19 #
  4. Aadmi
    Member

    In 2011 Pakistan will have a maximum electricity demand of 20,874 MW , in the summers. This is expected to grow to 41,132 MW by 2020.
    (Source: Private Power and Infrastructure Board - Govt. of Pakistan)

    While the state of California alone has an electricity consumption of 50,000 MW. All of California's electricity demand can be met by a 200 square mile Concentrated Solar Power (CSP) farm. (Source: American Energy Independence website).

    Pakistan total electricity demand for the next 10 years plus a surplus 10,000 MW can be a generated by a 200 square mile solar (CSP) farm.

    Im sure our politicians can dole out a 200 square mile patch of land. Maulana Diesel alone has 12.5 square miles to his name.

    Posted 11 months ago on 25 Jun 2011 10:05 #
  5. Problem is not the land for this project rather lack of will to go ahead with such projets.

    Posted 11 months ago on 25 Jun 2011 10:16 #
  6. Posted 11 months ago on 25 Jun 2011 11:18 #

RSS feed for this topic

Reply

You must log in to post.